Case Studies


Home Shopping Network: Equipment Upgrades, Full Protection

The HSNI electrical facility is always standing ready to provide backup power to any and all of its several facilities covering the 67-acre campus.

Read This Case Study
Home Shopping Network

ConocoPhillips: Oil Refinery

Because the local utility power isn’t yet available when this particular refinery installs four new water pumps, ConocoPhillips requires generators that can be used as prime power to start up and run the pumps.

Read This Case Study
ConocoPhillips

Ameren: Nuclear Power Plant Backup

Ameren turns to Kohler Rental for the backup generators to provide 6.2 megawatts of standby electric power.But the equipment plan is just a small part of a much larger effort.

Read This Case Study
Ameren

The Special Olympics Winter World Games

Special Olympics 2009 World Winter Games included large events in remote Idaho mountains and valleys, far from power sources and heated buildings.

Read This Case Study
Special Olympics

Fort Irwin: Military Logistics

Seeking a solution on an extremely accelerated schedule, Rockwell contacts Kohler Rental. While the job is large in scope, the timeline is the critical factor.

Read This Case Study
Ft Irwin

Shell Oil: Refining An Electrical Plan

As Shell's temporary power partner, Kohler Rental delivered continuous electrical power for eight weeks, 24x7, for a turnaround process, and the cokers were back in full operation as scheduled.

Read This Case Study
Shell Oil

G20 Summit: Flexibility, Security

To power the main convention center, Kohler Rental’s Technical Services and Design team customized three 2,000 kW KOHLER Rental power modules with transformers to meet the venue’s 4160V requirements.

Read This Case Study
G20 Summit

Obama Inauguration: Flexibility, Security

Only six days before the event,the scope of the project doubles, adding more security checkpoints and security support for the Capitol and Lincoln Memorial venues.

Read This Case Study
Obama Inauguration

Bonnaroo: Power for the People

Bonnaroo puts a premium on planning and experience. The first consideration is the remote location. If additional equipment is needed, trucking it in from Orlando takes about 20 hours.

Read This Case Study
Bonnaroo

National Talent Pool Designs Big Projects

As Kohler Rental continues to advance toward more centralized design, control and operations to focus on solutions for large-scale projects, four Kohler Rental veterans discussed collaboration, design and execution.

Read This Case Study
Big Projects

Extreme Makeover: Film Production and Construction

With television crews shooting 24/7 and with a clock counting down from 106 hours, every minute matters. There is no time for a power interruption, not even a hiccup.

Read This Case Study
Extreme Case Study

Harley Davidson Celebration:Brightest Show On Earth

Kohler Rental brought in over 5500 kilowatts of generator power, but that was the easy part.

Read This Case Study
Harley 100

Jamestown: An Event Fit for a Queen

The Anniversary Weekend in Jamestown was especially large, with 27 MW of power and infrastructure strung throughout 22 acres, including three primary entertainment venues.

Read This Case Study
JAMESTOWN

Kohler 'Chills' Millionaire's Row at Hot, Soggy Kentucky Derby

When skybox renovations at Churchill Downs displaced "Millionaire's Row" for the 2004 Kentucky Derby, 5,000 of the Derby's movers and shakers needed temporary seating and luxury hospitality.

Read This Case Study
Kentucky Derby